Incident 2016/LAR/024/077 · NAOC · 16 Mar 2016
TWO HACKSAW CUTS OF ABOUT 120mm LONG EACH AT 9-10 AND 1-2 O'CLOCK POSITIONS. A DYKE WAS CONSTRUCTED TO PREVENT FURTHER SPREAD. REPAIR WAS COMPLETED IMMEDIATELY AFTER THE JIV. NAOC RIGHT OF WAY
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State