Incident BPL/2026/013 · Belema E&P · 27 Aug 2026
2'' BALL VALUE WAS INSTALLEDAT 12 0' CLOCK POSITION ON 4'' SERA [S] DELIVERY LINE AND 2'' BALL VALUE INSTALLED AT 1O' CLOCK POSITION ON 4'' LIMA [L] DELIVERY LINE AT IDAMA/ JOKKA 1DCOMMUNITY IN AKUKU -TORU LGA R/S.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
12'' ENYIWEST -ENYIMAIN AT OGWU-IKPELE
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.