Incident 2016/SAR/035/054 · NAOC · 9 Feb 2016
SPILL WAS AS A RESULT OF FAILURE OF THE 6'' LEVEL CONTROL VALVE(LCV). THE SPILL WAS STOPPED BY RE-CALIBRATION OF VALVE; FACILITY SHUT IN
API Obama skimmer@Obamaflowstation in Nembe, Bayelsa state.
6'' Ogboinbiri Deep 5 Flowline at Ogboinbiri, Southern Ijaw LGA Bayelsa State.
24" AKRI - KWALE GAS PIPELINE AT BENEKU