Incident 2026/SAR/151 · NAOC · 27 Dec 2025
Hacksaw cut of about 120mm long was observed as at the time of JIV on a 6'' Flowline at 7 0'clock position.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI