Incident 2019/SAR/023/052 · NAOC · 2 Mar 2019
THERE WAS AN EVIDENCE OF 3'' VALVE INSTALLATION ON THE PIPELINE. THE SPILLED WERE MOPPED UP.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI