Incident 2026/SAR/013 · OANDO · 2 Jun 2026
The natural of the hole geometry was irregular and impaired with a 25mm hole at 5 O’clock position on facility.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
18'' EBOCHA - OGODO PIPELINE @ MGBEDE COMMUNITY
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Environmental Barge Leakage at Nembe 1 Manifold.
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
ANGO FLOW STATION AT KOLUAMA