Incident 2018/LAR/018/027 · NAOC · 7 Feb 2018
• The Joint Investigation Team visually observed that the suspected incident point was tied with a cloth and a zinc was installed underneath leading to an excavated pit of 0.008m in depth by unknown person. After excavation and removal of the cloth, a 2mm drill hole was seen on the flow line at 6 o’clock position. • The condensate noticed at the pit was 1.11barrels. Repairs was ongoing as at the time the JIV was concluded. • The impacted area was immediately mopped up. • The JIV was conclusive with no disruption at the time of investigation
12'' ENYIWEST -ENYIMAIN AT OGWU-IKPELE
4'' SARA DELIVERY LINE AT IDAMA JOKKA COMMUNITY R/S.
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.