Incident 2018/GLI/LAR/008/020 · NAOC · 25 Jan 2018
• The Joint Investigation Team visually observed that the suspected incident area was tampered with and covered with grass and an aluminium zinc. • After removal of the grass and zinc, the JIT noticed a 150mm hacksaw cut at 5 to 6 o’clock on the flow line carried out by unknown persons. • There was no visible impact around the area at the time of JIV. • The JIV was conclusive with no disruption at the time of investigation
API Obama skimmer@Obamaflowstation in Nembe, Bayelsa state.
6'' Ogboinbiri Deep 5 Flowline at Ogboinbiri, Southern Ijaw LGA Bayelsa State.
24" AKRI - KWALE GAS PIPELINE AT BENEKU
6" OLEH 3 L/S FLOWLINE CLUSTER AT OLEH
10'' KWALE - AKRI PIPELINE AT AGWE-ETITI