Incident 2018/GLI/LAR/011 · NAOC · 23 Jan 2018
• The Joint Investigation Team visually observed that the bolts on the flange at the gate valve area was loosened by unknown persons. • There was no visible impact around the area at the time of JIV. • The JIV was conclusive with no disruption at the time of investigation