Incident 2018/LAR/011/017 · NAOC · 24 Jan 2018
Unknown person loosed 4 nos bolts and nuts. one bolt was completely removed from the gate valve flanges. There was visible mark of hacksaw cut on one of the flange bolts. Impact was observed on a pool under the flange at the wellhead within the company's ROW
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
API Obama skimmer@Obamaflowstation in Nembe, Bayelsa state.
6'' Ogboinbiri Deep 5 Flowline at Ogboinbiri, Southern Ijaw LGA Bayelsa State.
24" AKRI - KWALE GAS PIPELINE AT BENEKU
6" OLEH 3 L/S FLOWLINE CLUSTER AT OLEH
10'' KWALE - AKRI PIPELINE AT AGWE-ETITI