Incident 2017_1949075 · SPDC · 16 Oct 2017
A previously installed 28'' by 14'' Plidco Split Sleeve Clamp by the SPDC Asset Owner was removed by unknown Persons. Half of it, was taken away by the suspected Clamp thieves while the remaining half was recovered by the security surveillance team and shown to the JIT. No Oil impact was observed as at the time of JIV.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.