Incident 2016/LAR/117/281 · NAOC · 3 Nov 2016
120mm HACKSAW CUT FROM (9-12) O'CLOCK POSITION WAS OBSERVED ON THE FACILITY.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI