Incident 2016/LAR/130/307 · NAOC · 28 Nov 2016
THERE WAS A VISIBLE HACKSAW CUT ON THE FLOWLINE @ (12, 1, 2 & 3) O'CLOCK POSITION RESPECTIVELY.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI