Incident 2016/SAR/169/295 · NAOC · 14 Nov 2016
THE FACILITY WAS CUT OPEN WITH GRINDING DISK AND WAS BLASTED WITH AN EXCLUSIVE DEVICE.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI