Incident 2016/SAR/134/231 · NAOC · 19 Sept 2016
AN UNKNOWN PERSON(S) INSTALLED A 3'' VALVE AND PIPE ON THE PIPELINE @ 12 O'CLOCK POSITIONS EACH FOR THE PURPOSE OF CRUDE OIL THEFT.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI