Incident 2016/SAR/125/209 · NAOC · 27 Aug 2016
VANDALS INSTALLED 3'' VALVE WITH 2'' PIPE CONNECTION ON THE PIPELINE @ 12 O'CLOCK POSITION
Environmental Barge Leakage at Nembe 1 Manifold.
ANGO FLOW STATION AT KOLUAMA
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
11 WELLHEAD MANIFOLD AT OKPAI COMMUNITY