Incident 2015_1481425 · SPDC · 7 Sept 2015
Unknown persons removed a previously repaired Clamp on the 28'' TNP, exposing the previous Hacksaw Cut (25cm long with 140mm effective point), there by re-impacting the adjourning Environment and the Stream that flows across the Pipe Line.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.