Incident 2015_1479080 · SPDC · 3 Sept 2015
Operational OR Maintenance Error occurred during an Environmental Upgrade of a 24'' Flare Head Line linking the Peremabiri Flow Station to the Flare Head - about 50M from the Flare Pit. The process was not followed through properly, which lead to discharge of Crude Oil into the Environment.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI