Incident 2015_1483075 · SPDC · 22 Aug 2015
Unknown Persons vandalized the Well Head:- The Cameron Control Unit (CCU) was removed, Sensor Lines cut-off and all the Facility accessories; up to the Assembly were completely removed and taken away.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI