Incident 2015_1469473 · SPDC · 22 Aug 2015
Unknown Persons vandalized the Facility:- The Cameron Control Unit (CCU) was removed and the 6mm in diameter Sensor Lines were cut-off, leaving behind the Actuator on the Well Head.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI