Incident 2016/SAR/021/035 · NAOC · 25 Jan 2016
AFTER EXCAVATION, IT WAS CUT ON THE ALREADY REPAIRED CONE AT 12 O'CLOCK POSITION ON THE PIPELINE
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI