Incident 2016/NL/LAR/008/015 · NAOC · 12 Apr 2016
THERE WAS A VISIBLE HACKSAW MARKS OF 80MM LONG BETWEEN (3-5) O'CLOCK POSITION ON THE FLOWLINE
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI