Incident 2016/LAR/021/064 · NAOC · 21 Feb 2016
THERE WAS A VISIBLE HACKSAW MARKS OF 110mm LONG BETWEEN (10-1 ) O'CLOCK POSITION ON THE FLOWLINE.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI