Incident 2024/LAR/014 · OANDO · 3 Jun 2026
on arrival at the spill location, the Joint Investigation Team noticed the flowline was on the surface of the ground. The Joint Investigation Team also noticed the soil was soaked with crude oil from the incident point on the flowline. upon exposure of the incident point, the 4'' flowline had visible signs of a hacksaw cut from 9-12 O' clock position as at time of the Joint Investigation Team. the length of the hacksaw was about 70mm long. repairs were effected immediately after the Joint Investigation exercise.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
18'' EBOCHA - OGODO PIPELINE @ MGBEDE COMMUNITY
12'' ENYIWEST -ENYIMAIN AT OGWU-IKPELE
4'' SARA DELIVERY LINE AT IDAMA JOKKA COMMUNITY R/S.
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A