Incident 2025/SAR/038 · OANDO · 25 Apr 2025
THE CAUSE OF SPILL WAS DUE TO SABOTAGE SINCE THERE WAS A VISIBLE 2'' VALVE INSTALLATION ON THE PIPELINE AT 12' OCLOCK POSITION. AREA OF IMPACT WAS WITHIN COMPANYS RIGHT OF WAY.
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.