Incident 2016/LAR/030/088 · NAOC · 28 Mar 2016
Vegetation facing the direction of the leak point was impacted which was outside the concrete casted around the wellhead but was within the company’s perimeter fence and crude was also found on the surface of water inside the cellar pit; NAOC RIGHT OF WAY. CLEAN UP MEASURES: REPLACEMENT OF NEEDLE VALVE; WELL SHUT IN
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI