Incident 2016/SAR/038/057 · NAOC · 12 Feb 2016
I. 2-Inch valve was installed on the pipeline at 12 O’clock position.
Environmental Barge Leakage at Nembe 1 Manifold.
ANGO FLOW STATION AT KOLUAMA
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
11 WELLHEAD MANIFOLD AT OKPAI COMMUNITY