Incident 2016/SAR/041/061 · NAOC · 19 Feb 2016
I. It was observed that a 2 inch valve that was previously installed on the pipeline was cut-off at 12 O’clock position.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI