Incident 2016/SAR/005/011 · NAOC · 10 Jan 2016
ON EXCAVATION, IT WAS OBSERVED THAT THE CONE OF A PREVIOUSLY REPAIRED POINT HAD BEEN BEEN CUT OFF
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI