Incident 2015/LAR/143/381 · NAOC · 3 Oct 2015
FAILURE OF A PERIMETER OF THE WASTE PIT RESULTING IN CRUDE OIL OVERFLOW
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
API Obama skimmer@Obamaflowstation in Nembe, Bayelsa state.
6'' Ogboinbiri Deep 5 Flowline at Ogboinbiri, Southern Ijaw LGA Bayelsa State.
24" AKRI - KWALE GAS PIPELINE AT BENEKU
6" OLEH 3 L/S FLOWLINE CLUSTER AT OLEH
10'' KWALE - AKRI PIPELINE AT AGWE-ETITI