Incident 035256 · SPDC · 14 Aug 2025
(1) Spilled oil was observed within and outside the company's ROW. (2) An inflicted 127mm straight cut similar to hacksaw cut, spanning from the 12 to 5 o'clock position, on the facility was observed.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI