Incident 2025/SAR/006/009 · OANDO · 4 Jan 2025
i. The area within ROW, outside the ROW and surrounding vegetation were completely burnt. ii. There was a 2’’ valve installed at 12 o’clock position by unknown person(s). iii. There was a containment boom deployed to contain and recover spilled crude oil.