Incident 1448819 · SPDC · 7 Jul 2015
A 2" VALVE WAS FOUND ON THE PIPELINE @ 12 O'CLOCK POSITION ON THE FIRST DAY OF JIV, WHILE ON THE SECOND DAY, THE INSTALLED VALVE (2") WAS FOUND REMOVED.THE AREA WAS HEAVILY IMPACTED.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.