Incident 2024_3453169 · SPDC · 8 Aug 2024
THE PREVIOUSLY FIXED CLAMP FAILED WHICH RESULTED TO ABOUT 1BBL SPIL. AFTER THE JIV, THE FAILED CLAMP WAS REPLACED WITH A NEW ONE.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.