Incident 3402623 · SPDC · 28 Jul 2024
A 2” ball valve with capping installed at 12 o’clock position of the pipeline. It was a non-leak at the time of JIV.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A