Incident 2026230 · SPDC · 29 Feb 2024
i. During initial assessment the JIV team observed recent activity within the incident point. ii. Upon exposure of the flow line by excavation, the JIT saw that a non-leaking 2’’ welded neck flange with blind was illegally installed at 12 o’clock position on the flow line by unknown persons. iii. The incident point was not leaking as of the time of JIV.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI