Incident 2015/SAR/112/159 · NAOC · 9 Apr 2015
Rupture on the Manifold as a result of Pressure from Sand Abrasion - leaving a HOLE on the T-shaped Pipe.
11 WELLHEAD MANIFOLD AT OKPAI COMMUNITY
OKPAI 25S WELLHEAD AT BENEKU, NDOKWA EAST LGA
API Obama skimmer@Obamaflowstation in Nembe, Bayelsa state.
6'' Ogboinbiri Deep 5 Flowline at Ogboinbiri, Southern Ijaw LGA Bayelsa State.
24" AKRI - KWALE GAS PIPELINE AT BENEKU