Incident 2075890 · SPDC · 10 Mar 2024
SPDC assets maintenance team told the JIT how they observed some activities at the well head on 9th March, 2024. When they mobilized to the site they saw a hose connected to the bean box on the wellhead by the vandals. They removed the hose and took pictures which was not geo referenced
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI