Incident IN-0768 · Heirs Energies Limited · 6 Apr 2024
Evidence of sabotage is apparent with the discovery of a 2" ball-valve installed at the 12 O'clock position on the 8" Umuechem-Nkpoku manifold delivery pipeline. The spill resulted from third-party interference, particularly when a truck transporting sharp sand unintentionally trespassed onto the pipeline, which had been sabotaged by unknown individuals, resulting in a rupture and subsequent oil spill.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.
4” MINI NTA WELL 2T FLOWLINE @ MININTA, ELELE ALIMINI, EMOHUA WEST LOCAL GOVERNMENT AREA.