Incident 2024/LAR/027 · NAOC · 27 Mar 2024
140MM LONG HACKSAW CUT WAS OBSERVED AT 10-11 O'CLOCK OF THE PIPELINE BY UNKNOWN PERSONS. THE CONTAMINANT WAS CONTAINED IN THE PIT DUG BY THE UNKNOWN PERSON WITH A LITTLE OVERFLOW WITHIN THE COMPANY'S RIGHT OF WAY.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.
4” MINI NTA WELL 2T FLOWLINE @ MININTA, ELELE ALIMINI, EMOHUA WEST LOCAL GOVERNMENT AREA.