Incident 1949179 · SPDC · 5 Feb 2024
• During initial assessment, the JIV Team observed loosed topsoil and a shallow ditch with a fresh crude around the incident point. • There was a hacksaw cut at 12 o’clock position by unknown persons. • The incident point was leaking during JIV. • The leak was stopped but the pipeline was no repaired as at the time of JIV.
12'' ENYIWEST -ENYIMAIN AT OGWU-IKPELE
4'' SARA DELIVERY LINE AT IDAMA JOKKA COMMUNITY R/S.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A