Incident 1951010 · SPDC · 5 Feb 2024
• During initial assessment, the JIV Team observed loosed topsoil and a shallow ditch with a fresh crude around the incident point. • After excavation, the JIT observed a 2’’ ball valve installed at 12 o’clock position by unknown persons. • The incident point was leaking during JIV. • The leak was stopped but the pipeline was not repaired as at the time of JIV.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State