Incident 1352523 · SPDC · 20 Feb 2015
sand bags were seen around the pipe on excavation, 0.82m section of the pipe was de-coated, no valve or nipple was installed on the pipe.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.