Incident 2015-1345770 · SPDC · 23 Feb 2015
the valve was blinded at the time of the JIV. the leak was from a loose bolt on the illegal installation. the loose bolt was tightened. repairs was not carried out at the time of the visit because the line was active.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State