Incident 2023_0584 · Heirs Energies Limited · 4 Sept 2023
• Upon excavation of the point (non-leaking), a 1ʺ ball valve with 2’’ galvanised pipe connection was installed on the pipeline illegally at 12 O’clock position by unknown person(s). This is attributed to oil theft activity. • There was no impact on the environment as a result of no spill.