Incident 2023_LAR_NL1_053 · NAOC · 3 May 2023
• 2’’ Ball valve was installed on the pipeline at 12 O'clock position. This is attributed to Third Party Interference (Sabotage) and for the purpose of oil theft (see figure 1). • It is a non-leaking point and no spill was recorded.
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State