Incident 1047031 · SPDC · 16 Mar 2023
At point 1 & 2: a 4" leaking ball valve was installed beside a 3" non leaking welded flange (both about 30cm apart), connected at 12 o'clock position and at point 3: a 3" galvanized pipe was connected to a 3" ball valve and installed at 12 o' clock position to the pipeline by unknown persons. this 3rd point was close to a formerly repaired point.
Open official source file
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.