Incident 1066058 · SPDC · 23 Apr 2023
DURING INITIAL ASSESSMENT, THE JIT OBSERVED RECENTLY EXCAVATED POINT AS THE INCIDENT POINT. THE POINT WASNOT LEAKING DURING INTIAL ASSESSMENT AND ALSO DURING JIV. UPON MANUAL EXCAVATION, THE JIT OBSERVED A 3" BALLVALVE WITH FLANGE INSTALLED AT 12 O'CLOCK POSITION BY UNKNOWN PERSONS THE INCIDENT POINT WAS NOT REPAIRED AFTER JIV RATHER THE MANUALLY EXCAVATED INCIDENT POINT WAS BACK FILLED WITHOUT REPAIRS OR REMOVAL OF THE IC.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.