Incident 1071422 · SPDC · 25 Apr 2023
THE JIT OBSERVED RECENTLY EXCAVATED DITCH AND A POOL OF STAGNANT WATER AT THE INCIDENT POINT. THE INCIDENT POINT WAS NOT LEAKING AS AT THE TIME OF INITIAL ASSESSMENT AND DURING JIV. UPON MANUAL EXCAVATION, THE JIT OBSERVED A 3" BALL VALVE WITH FLANGE INSTALLED AT 12 O'CLOCK POSITION BY UNKNOWN PERSONS. THERE WAS NO REPAIRS AFTER THE JIV AND THE POINT WAS BACK FILLED MANUALLY.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.