Incident 982829 · SPDC · 17 Mar 2023
At point 1 is a 2" galvanized elbow connected to a 2" ball valve installed @ 12 O'clock position on pipeline. At point 2 is a 2" ball valve installed at 12 O'Clock position on pipeline and at point 3 is a 3" screw valve installed at 12 O'Clock position on same pipeline, all within a 60m radius on the right of way by unknown persons.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.